93.50 lakh pilgrims visited the Shri Mata Vaishno Devi shrine, a significant pilgrimage and tourist destination in India, in 2023, recording the highest footfall in a decade.1
To ensure uninterrupted and highly reliable power supply for the sustainable growth of this holy place, Hitachi Energy delivered its innovative Hybrid Switchgear technology, empowering the customer to access reliable power supply from State Power Grid’s existing substation, while enhancing the experience for millions of devotees.
Hitachi Energy's Resilient Power Solution
Space Optimization
Minimizes footprint by utilizing existing infrastructure without the need for additional space.
Cost-Efficiency
Eliminates the need for a new substation, saving on investment, time, and resources.
Reduced Civil Works
Minimizes the need for extensive civil works, saving construction materials and man-hours, especially in challenging terrains.
Pioneering Technology
Demonstrates engineering excellence as the first installation of its kind in Jammu and Kashmir Power Transmission Corporation Limited (JKPTCL) substations.
Reliable Power Supply
Ensures uninterrupted and highly reliable power supply, critical for pilgrimage destinations like Mata Vaishno Devi Shrine.
Versatile Application
Supports grid connectivity for essential developments like cable cars, electric vehicles, improved lighting, and lodging facilities.